Completion overview
At the top, two widgets summarize your control health:Completion %
The percentage of controls marked as complete — with a progress bar showing your current position.
Assignment Breakdown
A donut chart showing how many controls are Completed, Needs Attention, and No Evidence.
Controls table
The main table lists every control with the following columns:| Column | Description |
|---|---|
| ID | Control identifier (e.g., VPM-2, IAC-7) |
| Control Name | What the control verifies, with a short description |
| Framework | Which framework this control belongs to |
| Monitoring | Number of policies, tests, and documents mapped |
| Owner | Assigned team member |
| Status | Completed, Needs Attention, or No Evidence |
Filtering
Use the toolbar to narrow your view:- Status filter — show only controls at a specific status
- Framework filter — focus on controls for a single framework
.png?fit=max&auto=format&n=tsMQJyneJ1xquFUo&q=85&s=4d401cc03b547d99b6f75a6bd170c334)