Skip to main content

What this check does

Checks network interfaces and firewall. Passes when: No direct public access.

Why this matters

Limit direct internet exposure.

How to fix

Remove direct internet exposure from VM instances
  1. Sign in to the Google Cloud Console and navigate to Compute Engine → VM instances.
  2. Click the instance, click Edit, and under Network interfaces set External IPv4 address to None, then click Save (use Cloud NAT for outbound traffic and IAP for admin access).
  3. Navigate to VPC network → Firewall and review the ingress rules.
  4. Edit or delete any allow rule whose source range is 0.0.0.0/0, replacing it with your office/VPN CIDR or internal ranges only.
Once resolved, DSALTA records a 200 (compliant) result on this test’s Source Data tab at the next scheduled run.

Frequently asked questions

Once a day, at 02:00 America/New_York, while the integration is connected. A run is skipped entirely if the integration is not in a connected state, or if the test has been deactivated.To see a fix reflected sooner, open the test from Data Library → Tests and click Run in the Run Test row. You need Full Access to run a test on demand.
The Status column answers “did the check run?”, not “did I pass”. Completed means DSALTA reached your system and finished evaluating — a check that ran and found a problem is still Completed.To see what it found, open the test and read the result code on the Source Data tab. 200 means nothing to fix; 204 means the check did not apply to your environment; 207 means it ran and found a compliance gap you need to act on. See Understanding test results.
Usually not. On an integration-powered check, Failed means DSALTA was blocked and could not evaluate it — result code 403 (a missing permission) or 428 (a setting DSALTA still needs from you). Code 500 means the run failed on DSALTA’s side.A genuine compliance gap does not turn the list red — it runs to completion and shows 207.
Deactivate it: open the test from Data Library → Tests, then use the menu at the top right of the panel and choose Deactivate Test. It applies immediately, with no confirmation step.Write your justification in the Comments tab before you deactivate. Once deactivated, every other tab is grayed out, so Comments is the only place an auditor can read why — see Test detail.
No. DSALTA only reads. It never creates, modifies, or deletes resources, and every remediation step is performed by your team directly in the third-party product.