What this check does
DSALTA compares the users on the Grist Access page against your People directory, matched by email within your organization. It passes when every Grist member is an active employee on the People page.This check also runs on 115 other integrations — see User access to Critical System should be valid for the full list.
Only organization members are on the Access page. Someone who was shared a single document or workspace as a guest does not appear here — review document and workspace sharing separately in Grist.
Passes when: Every user with Grist access is an active employee on the People page.
Why this matters
Access to the organization’s data workspace must be limited to current, authorized employees.How to fix
Review Grist team members- Sign in to getgrist.com as an owner of the team site.
- Open the team site home page and click Manage Team at the top right. Each row is one member with their role (Owner, Editor or Viewer).
- Compare every member against your current employee roster, paying attention to any address on an external domain.
- For anyone who should no longer have access, click the delete icon beside their name in Manage Team and confirm.
- For anyone over-permissioned, change their role in Manage Team — Viewer for someone who only reads documents. Site access reaches every document in the site unless Inherit access was switched off for a workspace or document, so check those exceptions too.
- In DSALTA, go to People and confirm every remaining Grist member maps to an active employee.
Frequently asked questions
How often does this check run?
How often does this check run?
Once a day, at 02:00 America/New_York, while the integration is connected. A run is skipped entirely if the integration is not in a connected state, or if the test has been deactivated.To see a fix reflected sooner, open the test from Data Library → Tests and click Run in the Run Test row. You need Full Access to run a test on demand.
What does the status actually tell me?
What does the status actually tell me?
The Status column answers “did the check run?”, not “did I pass”. Completed means DSALTA reached your system and finished evaluating — a check that ran and found a problem is still Completed.To see what it found, open the test and read the result code on the Source Data tab. 200 means nothing to fix; 204 means the check did not apply to your environment; 207 means it ran and found a compliance gap you need to act on. See Understanding test results.
The check shows Failed. Does that mean I am non-compliant?
The check shows Failed. Does that mean I am non-compliant?
Usually not. On an integration-powered check, Failed means DSALTA was blocked and could not evaluate it — result code 403 (a missing permission) or 428 (a setting DSALTA still needs from you). Code 500 means the run failed on DSALTA’s side.A genuine compliance gap does not turn the list red — it runs to completion and shows 207.
What if this check does not apply to us?
What if this check does not apply to us?
Deactivate it: open the test from Data Library → Tests, then use the ⋮ menu at the top right of the panel and choose Deactivate Test. It applies immediately, with no confirmation step.Write your justification in the Comments tab before you deactivate. Once deactivated, every other tab is grayed out, so Comments is the only place an auditor can read why — see Test detail.
Does DSALTA change my configuration?
Does DSALTA change my configuration?
No. DSALTA only reads. It never creates, modifies, or deletes resources, and every remediation step is performed by your team directly in the third-party product.
.png?fit=max&auto=format&n=tsMQJyneJ1xquFUo&q=85&s=4d401cc03b547d99b6f75a6bd170c334)